5 Essential Tips for Sitework Estimating

sitework estimating

Sitework Estimating may need to be clarified with construction estimating. However, that is not the case. This step is taken before the start of construction. It is to see how viable a site is for the following project. This step is an essential one and happens in all projects whether it’s residential, commercial, or industrial. Precise estimations in this process require experience and practical knowledge. Including expertise in the requirements of resources plays a vital role.

Firstly, An expert must be aware of all the material components needed
Secondly, how much labor is required for the timely completion
Third and last, what type of equipment is most suitable for the project?

Together, these factors make a profitable site project. If an estimator does not have full information about the resources. Then the project might face grave difficulties in the future.

What is Sitework Estimating?

When it comes to construction, this estimation process involves everything to start a project. It mainly includes:
Driveways
Walkways
Pavements
Sewer
Erosion control
Lawns
Pools

In the United States, every project has a site. Whether it is above ground or below. Also, a water disposal and distribution system is a vital part of site work Estimating.

Experts at SMA Estimating LLC can provide accurate and Affordable Cost Estimation. Thus, improving the efficiency of a project and making the process reliable.

Enhance Your Sitework Estimating Process
Now let’s discuss the topic at hand and delve into the 5 most essential tips in site work estimation

Make sure that estimates are accurate
Extensive planning is essential in the Sitework Estimating process. To ensure its accuracy complete construction documentation with breakdowns must be prepared. To achieve that an estimator must gather all the information necessary. After that, an estimator must go through these documents to get a better understanding. Also, to prepare the estimates concerning these documents. Accuracy is confirmed by the following factors:

Quality of construction
An estimators expertise
A Comprehensive database of cost
Knowledge and using required software.

Breakdown the cost of resources to improve quality
A skilled estimator develops an understanding of required resources. This is done after a thorough analysis of site plans and specifications. It is an important step in the process of Site Estimating. This step included:

Determine the cost of Materials

An estimator must understand the nature of a site and prepare a quantity takeoff. This is done to calculate the right amount of material needed. Material such as:

Concrete
Pipes
Fixtures
Seeding
Sodding

After the required materials are determined, an estimator has to calculate the total cost.

Labor

The labor estimate is to check how much labor is required. Then labour hours are calculated to complete the project by agreeing on an hourly rate.

Equipments

After materials and labor, an estimator has to identify the required machinery. Whether the equipment is needed on an hourly basis or daily. Then that cost will be incorporated into the process of Site Estimating.

Utilize the most Appropriate Software
An estimator must incorporate the most appropriate software while working on Site Estimating. Before choosing software, an estimator must check whether it will be helpful. Also, the applied software must be able to provide cost-effective techniques throughout the project. By using Software, an estimator can put specific information regarding the project and get the most precise results.

Use Historical data, if applicable
An immense database of information may be available if working on a new project of a similar nature. If that is the case, an estimator can use the past data and implement it in the process of Site Estimating. One way to access the information database is by doing this time is saved and accuracy is assured.

Apply the most suitable technique
Site Estimating is a complex task as it involves many factors. There are several ways to create estimations. Below, some of the widely used techniques are as follows:

Lump sum / Assembly Technique

In this technique, the whole project is priced as a whole. An estimator prices all the elements of the project collectively. This technique is really helpful if the budget is limited and a fast evaluation is needed of the total cost.

Unit Pricing Technique

This technique involves breaking down all the components and pricing them individually. This is usually the most accurate technique. All the factors are extensively dealt with. The only drawback with this technique is that it is very time-consuming.

Square footage Technique

This technique is simple compared to the other two. It is the most suitable choice for those sites which are not complicated. In this, an estimator calculates all the materials and the total square footage of the site. The average price per square footage is $ 0.90 to $ 2.30.

A Construction Estimating Company needs to evaluate the Site and incorporate the most suitable technique to get precise results.

Conclusion

In summary, Sitework Estimating is an important process to determine the costs. A detailed estimation can elevate the chances of profitability. In this article, the top 5 essential tips have been discussed which can increase the quality of estimates.